The Lebanon Library project featured a VRF system for the second-floor study rooms, allowing each room individual temperature control. A key challenge was locating the exterior condensing unit, as there was no flat rooftop space. Our solution was to install the unit inside the existing penthouse mechanical room, which provided sufficient space and ventilation. Design began in late 2023, with the library opening in early 2025.
Project Gallery
Ready to Learn More?
We’d love to learn about your goals and bring your projects to life.
McCordsville, IN | This project transformed an old volunteer fire department building into a vibrant community center for all of McCordsville to enjoy.
Fulton, IN | Working closely with the client and architect, we assisted in designing a new entry and circulation desk to improve access and functionality for library visitors.
Sellersburg, IN | The Tri-Township Fire Department project features a thoughtfully designed HVAC system, including two variable volume rooftop units (RTUs) with VAV boxes distributed throughout the main building to provide efficient zoning and occupant comfort.