The Lebanon Library project featured a VRF system for the second-floor study rooms, allowing each room individual temperature control. A key challenge was locating the exterior condensing unit, as there was no flat rooftop space. Our solution was to install the unit inside the existing penthouse mechanical room, which provided sufficient space and ventilation. Design began in late 2023, with the library opening in early 2025.
Project Gallery
Ready to learn more?
We’d love to learn about your goals and bring your projects to life.